Urethane Cement Kitchens Ready for Dublin’s Grand Openings
Dublin’s newer retail centers keep filling with restaurants, and many of those kitchens sit on slabs that were poured not long ago. A fresh slab still holds a lot of water, which can lift a thin epoxy. Urethane cement goes down thick, tolerates that moisture, and takes the steam, hot oil and boiling rinse water a kitchen throws at it. Johnny Mendoza builds it to your opening date.
JP Resin Certified · Don Resin Certified · Based in Hollister, Working Dublin
From Hollister, Johnny runs up 680 to restaurant build-outs along Dublin Boulevard.
A new slab is a wet slab
People assume a brand new building means a dry floor. It is closer to the opposite. A freshly poured slab is full of water that has to work its way out through the top surface, and it can keep doing that for months after the walls go up and the shell is handed to the tenant. Lay a moisture-sensitive coating over it and that vapor pushes against the bottom of the film until it blisters.
Urethane cement is a better match for that kind of slab. It tolerates more moisture coming up from below than epoxy does, so a kitchen build-out on a young slab has a realistic path to opening on time. It still gets tested. Johnny sets humidity probes in the slab, reads them, and picks the primer and prep from the numbers.
On a young slab, the moisture test is the first line of the schedule.
The heat side matters just as much. Kitchens hit the floor with boiling water at the dish station, hot oil at the fryers and cold air from the walk-in door, all in one shift. Urethane cement goes down far heavier than a rolled coating, close to a quarter inch on a working kitchen floor, and moves with those swings instead of cracking at the bond line.
It is a working floor. The finish runs matte to textured in a short list of colors, which suits a kitchen fine. If the dining room needs to look like a showpiece, that is a separate floor and a separate conversation.
Four corners of a Dublin build-out kitchen
Each station gets its own thickness, texture and edge detail, decided before the equipment is set.
Fryers and ranges
Hot oil, dropped pans and a floor that stays greasy through service. Full-thickness urethane cement with an aggregate broadcast gives cooks grip in wet shoes, and it handles the oil plus the degreaser that chases it every night.
Dish station
The hottest water in the building lands here, often all night. The floor runs up the wall in a coved base so no corner holds standing water, and it gets feathered into the floor sinks so dirty water drains instead of pooling at a lip.
Walk-in thresholds
Cold air rolling out of a cooler or freezer door meets a warm kitchen floor over and over through a shift. That strip takes urethane cement at full thickness and careful work at the door frame so condensation cannot creep underneath.
Prep and storage
Sugars, citrus, vinegar and brine end up on prep room floors, and food acids are hard on many finishes. A slightly finer texture here mops clean faster, and the same coved base keeps the prep area easy to hose down.
Floor first, then the stainless
In a build-out, the best day to install a kitchen floor is before the stainless shows up. With the room empty, the urethane cement runs wall to wall in one continuous floor, the cove goes up every wall without gaps behind equipment, and the floor sinks get finished cleanly. Coating around a line of ranges that is already set leaves edges, and edges are where kitchen floors start to fail.
That means getting into the general contractor’s schedule early. Plumbing rough-in and floor sinks have to be set first, because the floor ties into them. Walls need to be up and their bases ready for the cove. Johnny walks the space with whoever runs the build-out, marks where the drains sit and how the slab slopes toward them, and flags any low spot that will hold water. A floor sink set too high leaves a ridge, and one set too low collects a ring of standing water.
Kitchen inspections tend to look closely at floors and wall bases. A smooth, coved, joint-free floor that drains is easy to keep clean and easy for an inspector to read. Johnny asks which cleaners and sanitizers your crew will use so the texture and topcoat suit them from day one.
Set the floor first. The stainless can roll in once it cures.
Grand-opening math on a young slab
A Dublin restaurant opening usually comes with a lot already booked: staff training, a soft opening, maybe a ribbon cutting with the retail center. The floor has to land inside that. Urethane cement helps because many systems return to foot traffic quickly and take carts and equipment soon after, which leaves room for the equipment install and the final clean before inspection. Leave too little time and the floor becomes the thing everyone waits on.
The slab still sets the pace. If the probe readings come back high, Johnny adds a moisture-tolerant primer and you see it on the written price before work starts. If the slab was finished with a curing compound or sealer, that comes off in the grind, because urethane cement needs an open, clean surface to grip. Saw-cut control joints get respected, so the slab can move without cracking the floor above it, and the joint gets a flexible sealant at the surface so grease has nowhere to settle.
Summer in the Amador Valley adds one more variable. A hot slab and warm material shorten working time, so when the space has no air conditioning running yet, Johnny schedules mixing for the cooler part of the day. Early starts are normal on a July job. For the full rundown on systems, thickness and textures, see our urethane cement page.
Opening-day questions from Dublin restaurant owners
Our shell was handed over last month. Is the slab too new to coat?
Not necessarily, but it needs testing. A young slab can still be releasing a lot of moisture. Johnny sets humidity probes and reads them before choosing a system. Urethane cement tolerates more moisture than epoxy, and if the numbers run high, a moisture-tolerant primer goes into the plan with its cost shown up front.
Should the floor go in before or after the kitchen equipment?
Before, whenever the schedule allows. An empty room lets the floor and its coved base run continuously behind where the ranges, prep tables and dish machine will sit. Floor sinks and plumbing rough-in need to be set first. If some equipment is already in place, Johnny works around it with a sealed edge.
How tall should the cove at the wall be?
Your drawings or the local health department usually set that number. Johnny builds the cove to the height on the plans and carries it around columns and door frames, so the corner where floor meets wall is one smooth piece. If the plans say nothing, he checks with your contractor before he picks one.
Is urethane cement nice enough for the dining room too?
It can go there, though many owners pick something else out front. Urethane cement stays matte to textured in a short range of colors, which suits a kitchen and reads plain in a dining room. A common pairing is urethane cement in back and a polished slab or a decorative coating in front, changing over at the kitchen door.
We are taking over a space a previous restaurant left. Does the old floor come up?
Usually, yes. A worn kitchen floor often has failed grout, lifted coating and grease soaked into the slab around the old fryer line. Johnny removes it, degreases and grinds until the slab is clean, then probes for moisture. A second-generation space can save time when the floor sinks already sit where your new layout needs them.
How much grip should we ask for?
Enough for a cook in wet, greasy shoes to stay planted, while the closing crew can still squeegee the floor in one pass. Johnny adjusts the aggregate by station: heavier at the fryers and dish area, finer in prep and storage. Samples at the site assessment let your kitchen manager feel the difference underfoot.
Put the floor on the build-out schedule
Send Johnny your kitchen plan, the opening date and the name of your general contractor. He drives up from Hollister, walks the space, probes the slab and checks where the floor sinks sit, then writes a price that separates prep, moisture work and the floor itself, so nothing shifts once the trades are moving.
Browse finished work in the gallery. Drawings ready? Send the kitchen plan here and Johnny will mark it up before he visits.